READY MIXED
|
|
|
|
|
  | Quality Control  |   Projects  |  Locations  |  Industry Links  | Dispatch | MSDS | CIP |  

Ready Mixed Projects

Chandler Concrete Company excels at special needs projects being one of the few area companies that can provide a high level of technical expertise and design mixes.

 
__________________________________________________________________________
One NCDOT contractor had to fill 19,000 feet of underground 16 inch pipe under an interstate highway with concrete. His objective was to minimize the number of openings to receive the concrete, as his job costs were directly related to the number of holes he had to cut. The contractor requested that Chandler meet an aggressive goal. Chandler designed a flowable fill mix that not only met, but exceeded, the contractor’s goal as well as meeting NCDOT requirements.
__________________________________________________________________________

Chandler also can meet challenging pours whether around-the-clock continuous or freezing temperature pours – or both! This project started in late December in bitter cold conditions, snow and sleet. Chandler Concrete took all measures possible to ensure the quality of the concrete with last-minute alterations. The plant was wrapped with tarps and three heaters kept the material from freezing. This was a continuous 7-8 day pour.

 

 


__________________________________________________________________________
Excessive heat is no problem for Chandler Concrete. This was a six-day continuous pour in the middle of summer with heat nearing 95 degrees daily. Again, all precautions were taken to keep the pour going during heat and strong thunderstorms.
__________________________________________________________________________
This project was to take 11,000 yards and 1.5 years to complete. Started in spring of 2006, this project is ahead of schedule and will be completed by the end of 2006 with great success in service and quality concrete.
__________________________________________________________________________

Sometimes, special equipment is required to complete the job. Pouring the footings for this home was possible with a concrete pump.

Home      About Us      Contact Us      Projects      Calculator     Dispatch and Delivery     Press     Locations     Industry Links
Employment Opportunities       Employees        Newsletters      Weather       MSDS       Credit Application       Trucks for Sale

© 2006 Chandler Concrete Company Inc.

1006 South Church Street • Burlington, NC 27215 • 336-226-1181 • Mail: PO Box 131 • Burlington, NC 27216 sales@chandlerconcrete.com

Produced by Princeton Marketing Group